|
Left: New, rededigned bronze and purpleheart engine beds. The shaft log has been bored and
the original bronze tube restored.
Lower Left: Installing two-layer laminated ribbands, scarfed full-length in
preparation of planking.
Lower Right: Port garboard shaped and molded.
Next Page
|