|
Last came the starboard side planking and caulking, and the refastening of several plank butts in the bottom. New planking material is on its way, and when "Liberty" returns this fall, we
will be replacing as much topside planking and frame-to longitudinal bolts as the three month haul permits.
Proceed to "Elvica" Project...
|