Project Stages

Tamerlane-4
Home About Us Projects Shop Tour Contact Us
HPIM0423
HPIM0428

Left:
Three new bronze floors, which will for the base of the mizzen step, and act as a main shaft "alley."

Lower Left: Bronze floors in place and aligned with shaft log – note old frames and planks to be replaced once all the heavy timbers are in.

 

Next Page - Cho-Cho San Project


Web Design By: The Writing Shop